Peter Western Bridge Replacement
1. PROJECT DESCRIPTION: Design, engineer, furnish and install soldier piles to support excavation for bridge construction.
2. CONTRACT AMOUNT: 270K 3. CONTRACT DURATION: From 1/7/2020 to 1/23/2020. 4. COORDINATION WITH OWNER AND PRIME CONTRACTOR: • Prompt order and delivery of soldier piles • Design to support 600 ton and 550 ton cranes 5. REFERENCE: Owner: City of Burien Prime: Hamilton Construction Company. 6. PROJECT EXPERIENCE BENEFITS: • Installation of soldier piles in gravel material with high water table • Installation of piles in difficult access areas • Sequencing and coordinating with prime contractor to meet the project schedule |
EASTSIDE INTERCEPTOR SECTION 2 REHABILITATION PHASE II
1. PROJECT DESCRIPTION: Furnish and install NZ38
sheet piles and bracing. Installation was done using a sheet pile press. 2. CONTRACT AMOUNT: 450K 3. CONTRACT DURATION: From 5/6/2019 to 5/17/2019. 4. COORDINATION WITH OWNER AND PRIME CONTRACTOR: • Prompt order and delivery of sheet piles to meet the schedule • Sequenced bracing installation to facilitate excavation 5. REFERENCE: Owner: King County Prime: Kiewit Infrastructure West Co. 6. PROJECT EXPERIENCE BENEFITS: • Installation sheet piles using the press method • Installation of piles next to BNSF tracks • Installation of piles in difficult access areas • Sequencing and coordinating with prime contractor to meet the project schedule |
INTERSTATE 5 PORT OF TACOMA ROAD INTERCHANGE PHASE 1
1. PROJECT DESCRIPTION: Furnish and install 900 ea. 25' long treated timber piles with fixed lead pile driver.
2. CONTRACT AMOUNT: 1.8M 3. CONTRACT DURATION: From 10/1/2018 to 2/6/2019. 4. COORDINATION WITH OWNER AND PRIME CONTRACTOR: • Provided analysis/ insight into driving piles under transmission lines. • Use of a hydraulic impact hammer which allowed SC to safely drive piles adjacent to I-5. 5. REFERENCE: Owner: City of Fife Prime: Goodfellow Bros Inc. Geotech: GeoEngineers Inc. 6. PROJECT EXPERIENCE BENEFITS: • Installation of treated timber piles with fixed lead pile driver • Installation of low overhead piles under transmission lines • Installation of piles adjacent to I-5/in heavy traffic areas |